2015年6月30日星期二

Gantry cranes are mostly horizontal luffing system

Steel factory equipment  the weight and center of gravity of each boom system luffing process is almost no vertical displacement. One way is by adding events counterweight to balance the lifting boom system changes the center of gravity of the pitch synthesis when this method is more convenient arrangement, work is also more reliable and widely used. The semi gantry cranes second method is to rely on institutional characteristics of the boom system to ensure that the movement trajectory when the center of gravity close to the level luffing synthesis, No activity counterweight.

Crane supplier  along the trajectory of the heavy lifting to move closer to the horizon in the luffing process, compensation methods and compositions can be used boom law. Compensation Act by the special storage system automatically retractable rope hoisting rope luffing appropriate process to compensate boom lift spreader vertical displacement caused. Arm method is to rely on institutional characteristics guarantee Arm arm ends move closer level luffing process. Both methods are widely used.

2015年6月19日星期五

Gantry crane use can be divided into three categories

Use can be divided into three categories:① cargo handling portal crane : mainly used in ports and open stockyard, handling with grab or hook. From the weight of not more than 25 tons, not with the magnitude of the change. Higher operating speeds, it is often an important indicator of productivity.portal crane manufacturer, shipbuilding gantry crane: mainly used for berth, floating docks and outfitting scene, performed splicing hull, outfitting equipment and other lifting work, with a hook as a spreader. Maximum lifting capacity of 300 tons, from the weight of large amplitude is reduced accordingly. How stall lifting speed, light weight lifting when lifting speed can be increased. Some agencies also work with micro-devices to meet the installation requirements. Gantry height greater, can be adapted to the requirements of large lifting height and substantial job, but the operating speed is low, job productivity is not high.

③ construction and installation with portal cranes: mainly used in irrigation dam hydropower station, hoisting equipment and prefabricated parts, usually with hooks. From the weight and the operating speed is generally between two cranes before. It has good transport machine disassembly, spreader decentralization depth, can better adapt to temporary work and work on the bridge and other features.

2015年6月16日星期二

More than half gantry crane with box type and truss structure

Semi gantry cranes  is between an overhead crane and gantry crane between semi gantry cranes have only one leg crane bridge crane as the other end as the plant crane beam frame, frame orbit on a plant commonly known as day orbit, the orbit on the ground, said ground rail. Semi-gantry crane hoisting mechanism, trolley traveling mechanism and bridge construction, and bridge crane basically the same. Since the span, crane operating agencies they use are driven way to prevent the crane operation produce skew increases resistance, even accidents, in order to prevent falling or tipping lines in strong winds, wind measurements and is equipped with interlock operating agencies Crane rail clamp. 

 Semi-gantry crane electric hoist normally, so the rated capacity is usually 16 tons or less.Portal crane Use of box type and truss structure, the most widely used. You can carry a variety of bulk materials into items and, from the weight of 100 tons, a span of 4 to 39 meters. Grab common with the work of a higher level gantry crane. Common gantry crane mainly refers hook, grab, electromagnetic, hoist gantry crane, but also includes semi-gantry cranes.